They would need to be a PE.  This individual will work closely with our Project Director on creating the project management workflow and launching the civil engineering division of our company. 

 

Below are the areas of expertise:

 

Design Iteration

Activities and Inclusions

Interconnection Application (IA)

Amp will create an initial Site Plan Drawing that includes and outlines and will share the CAD drawing to the EOR:

  • Site Location (GPS coordinates/911 Address/adjacent roads)
  • Parcel boundary
  • Wetlands (if available through town/county GIS)
  • Point of Interconnection (POI) /Point of common coupling (PCC)
  • General array area (module count and racking style)
  • General Access Roads and Turn Arounds
  • General Equipment Pads
  • AC size
  • Interfacing transformer(s)
  • Interrupting device(s)
  • Isolation device(s) (e.g. generator disconnect)
  • Company pole number nearest the proposed PCC
  • Company line extension to site and from nearest Point of Interconnection
  • Restricted accesses, fences, gates and access controls
  • Existing and proposed Access road(s) including, at a minimum, road material, surface loading criteria, and dimensions to confirm Company personnel and equipment access requirements are met.
  • Generator location(s)
  • Existing service(s)

Issued for Permit (IFP)

Update IA Drawings to include:

  • Adjacent Parcel Boundaries/owner info
  • Site outline
  • Setbacks (wetland/parcel/fence/road/structure)
  • Wetland delineation
  • Survey data
  • All Town/County permit drawing requirements
  • Road detail
  • Project Phasing
  • Fence line
  • Tree line, additional visual screenings as needed
  • Construction staging area
  • Electric lines/poles (overhead and underground)
  • Storm Water Pollution Protection Plan
  • Secondary containment (if applicable)
  • Stormwater Basins/Infiltration trenches/Level Spreaders

Issued for Tender

(IFT)

Update IFP Drawings with the following:

  • Topography
  • Implement any town/county requirements

 

Issued for Construction

(IFC)

Update IFT Drawings to include:

 

 

As Built

Update IFC drawing to reflect changes after IFC issued

Share

Apply for this position

Required*
Apply with
We've received your resume. Click here to update it.
Attach resume as .pdf, .doc, .docx, .odt, .txt, or .rtf (limit 5MB) or Paste resume

Paste your resume here or Attach resume file

Human Check*