They would need to be a PE. This individual will work closely with our Project Director on creating the project management workflow and launching the civil engineering division of our company.
Below are the areas of expertise:
Design Iteration | Activities and Inclusions | |
Interconnection Application (IA) | Amp will create an initial Site Plan Drawing that includes and outlines and will share the CAD drawing to the EOR: | |
|
| |
Issued for Permit (IFP) | Update IA Drawings to include: | |
|
| |
Issued for Tender (IFT) | Update IFP Drawings with the following: | |
|
| |
Issued for Construction (IFC) | Update IFT Drawings to include: | |
|
| |
As Built | Update IFC drawing to reflect changes after IFC issued |